Sagarmatha Power Company

Sagarmatha Power run-of-river hydropower plant dam and generator site in Nepal

Sagarmatha Power Company Pvt. Ltd.

Energy Company

B.S. 2054/05/25 · A.D. 10/09/1997

Sagarmatha Power Company (P) Limited (SPCL) was established and registered with the Government of Nepal on September 10, 1997 (Bhadra 25, 2054) under the Company Act 1997 for promotion and investment in hydropower, utilizing the largest source of renewable energy in the nation.

The birth of SPCL was a culmination of effort of the principals with all determinations and commitments of its directors who have got long and wide professional and management experiences of proven quality.

SPCL’s main motto is to “Provide management services of highest professional standard in the field of hydro-power to ensure client satisfaction and reputation for excellence”.

In the interest of exploring economic development through a sustainable approach, the company has undertaken a joint venture with Power China Resources, China, through a JV company, Sino Hydro Sagarmatha Power Company (P) Ltd., for the 50 MW Upper Marsyangdi Hydro Power Project in Bhulbhule Village Development Committee in Lamjung District. The project started power generation from 26th September 2016 and is now supplying power to Nepal Electricity Authority through the national grid.

We at SPCL welcome investors to join with us to invest and harness the huge hydropower potential of Nepal.

The main objective of SPCL is as follows:

  • To plan, investigate, design, build, own and operate small and medium size hydropower projects
  • To undertake management contracts for operation of hydropower projects
  • To undertake the rehabilitation works of hydropower projects
  • To provide engineering and other consulting services for hydropower development and power related sectors
  • To collaborate, if required, with foreign firms as well as local firms for achieving the above objectives